Eaves
Program and model
National floor. A ZIP opens the same question at a place where a sourced instrument exists.
has a sourced instrument. Open the local Build answer →
No sourced local instrument is mapped for . The national floor below is the answer.
The answer
- Model code 2018 IWUIC Class 1 noncombustible eave
- Model code 2018 IWUIC Class 2 solid eave enclosure
- Model code 2021 IWUIC Class 1 noncombustible eave
- Model code 2021 IWUIC Class 2 solid eave enclosure
- Model code IWUIC Class 1 noncombustible eave
For national eaves, the national eaves requirement is 2018 IWUIC Class 1 noncombustible eave. On national eaves, it is shown as model code. Read the national eaves rule, then compare 1 matched national eaves product.
Review 18 national eaves place answers before choosing among national eaves records. The national eaves links keep the rule, products, and place differences together.
Find what applies near you
Enter a ZIP before browsing the complete evidence. Matching, inherited, and place-neutral records will move first; other places and unmapped application rows will fold into expandable groups. Nothing is removed. All 3 state rule sections remain available.
Evidence prioritized for
Matching, inherited, and national evidence is open. Other locations and records not yet joined to a place are collapsed below and remain available.
The rule
Model code “Eaves and soffits shall be protected on the exposed underside by ignition-resistant materials”
Products matching the model-code floor
Additional products matching the voluntary program
No sourced eaves product in this directory yet matches the voluntary program.
Questions
What is the Oregon 12-foot rule for eaves?
Two rules share the number. R327.3.2.1, where adopted, does not allow ordinary vents on the underside of eaves, soffits, or cornices unless the opening is 12 feet or more above grade or the vent is manufactured to resist flame and embers. R327.3.4.1 requires protection of exposed rafter or truss undersides and enclosed soffits when any portion of that framing is under 12 feet. Deschutes County says there is no 12-foot exception for the underside of elevated decks.
Is vented fiber-cement soffit an ember-rated vent?
No. Perforated or louvered fiber-cement soffit is cladding. It is not 1/16–1/8 inch mesh and it is not an ASTM E2886 listed vent. OSFM 8160 listings for HardieSoffit and CemSoffit on this site are the un-vented under-eave material. See Findings.
What is OSFM 8160?
It is the California OSFM handbook category for horizontal projection undersides, including eaves. Many rows name SFM 12-7A-3. Some rows are listed as noncombustible under-eave material. It is a soffit or underside assembly, not a vent. Category 8165 is vents.
Is SFM 12-7A-3 the same as ASTM E2957?
No. SFM 12-7A-3 is the California underside test. Many OSFM 8160 rows name it. Oregon R327, where adopted, names ASTM E2957 among other covering paths. Deschutes County counts handbook products when they are shown on the drawings. The building official still decides.
Do I have to box in open rafter tails?
Where R327 is adopted and any of the eave framing is under 12 feet, you must protect the underside. Enclosure is one way. The code also allows noncombustible covering, ignition-resistant covering, 5/8 inch Type X gypsum behind the covering, a one-hour assembly, or an ASTM E2957-tested soffit. Fascia is exempt. A 4x tail is seminar practice, not a fifth numbered eave item. See the Craftsman eaves guide. IBHS Enhanced and California Safer from Wildfires ask for enclosed eaves. That is a checklist, not the R327 wording.
Does IBHS Essential require enclosed eaves?
No. Essential targets ember ignition at the roof, vents, gutters, and Zone 0. Enclosed eaves are an Enhanced item. They are also a California Safer from Wildfires insurance measure. They are not the Oregon code floor.