Home / Guides / How the documents differ / WUI doors versus 20-minute fire doors
WUI doors versus 20-minute fire doors
A 20-minute fire door is not automatically a wildfire door. OSFM category 8150 is California’s BML bucket for exterior doors in the WUI. Oregon R327.3.6 covers glazed doors and skylights, not a solid swinging leaf. A listing is not a permit.
You are holding a 20-minute tag and an 8150 handbook row. Those tests can share a number and still not be the same job.
The doors category is the catalog. This page is the word swap. Do not use a house-level hub graphic as a door leaf.
Why it matters
Interior fire-door tests look at room-to-room fire. WUI listings look at embers and flame on the exterior assembly. Swapping them specs the wrong hole. Garage weatherstrip is a third object.
How the objects split
| Object | What it is | What it is not |
|---|---|---|
| 20-minute / NFPA 252 fire door | A fire-door test some 8150 rows also cite | Automatic WUI compliance |
| OSFM 8150 | California exterior-door WUI listing | Oregon R327.3.6 |
| R327.3.6 | Tempered, multilayered, glass block, or 20-minute glazing | A solid wood leaf path |
| Garage weatherstrip | Ember gap at the slab | An 8150 SKU |
The paths
1. Glazed opening. Use dual-pane versus tempered.
2. Solid leaf in California. Read the 8150 row. Match the model. Listing is usually voluntary.
3. Solid leaf in Oregon. R327.3.6 does not name it. Ask the official. Deschutes may accept a handbook product on the drawings.
4. Garage. Weatherstrip. No extra hole. Not this 8150 catalog.
What people mix up
- 20-minute as 8150.
- 8150 as required in Oregon.
- A glazed slider as a solid-door listing.
How to check
- Is the leaf glazed or solid.
- Which program is on the drawing. 8150, a fire-door standard, or R327.3.6.
- Confirm the live GOVmotus record if you use 8150.
Limits
This page does not reprint 18 handbook rows. FireApproved is not the AHJ.
Related records
Questions
Is a 20-minute fire door a WUI door?
Not by itself. Some 8150 listings cite NFPA 252 or a 20-minute rating. That is a fire-door test. WUI 8150 rows can also address ember and flame exposure of the exterior assembly. Read the listing. Do not swap the two.
Does Oregon R327 list solid entry doors?
R327.3.6 names exterior windows, windows within exterior doors, and skylights. Glazed doors share that menu. A solid swinging leaf is not that subsection. Confirm the adopted code with the official.
Do I need 8150 in Oregon?
Listing is usually voluntary. Deschutes accepts handbook products when they are shown on the drawings. Absence from 8150 is not an automatic ban.
Sources
- 2025 California Wildland-Urban Interface Code construction notes, Section 504.9
- 2006 Utah Wildland-Urban Interface Code
- Salt Lake City Code 18.44.010 International Fire Code and Standards Adopted
- Taylorsville Ordinance 25-15 Utah Wildland Urban Interface Code
- 2023 ORSC Section R327 amendment
- 2025 OSFM WUI Listed Products Handbook (2 September 2025)
- Wildfire Prepared Home Technical Standard (December 2025)