Home / Diagrams / DET-014

FA Exhibit DET-014

Roof-to-wall & dormer cheek transitions

An orientation view and enlarged conceptual section show a dormer cheek as one roof-to-wall line with three separate jobs: roof assembly, exterior wall covering to the roof, and flashing at the debris-collection joint.
FA Exhibit DET-014. Roof-to-wall and dormer cheek transitions. AFTER FEMA P-737 §4.1.1 + ROOF-SYSTEM RECOMMENDATIONS AND 2023 ORSC R327.3 / R327.3.3.1. Illustrative — not a construction document. Verify with your building official. CC BY 4.0.

Technical review: Grayson Graham. Last verified 2026-08-25. JSON

Copy this embed

<img src="https://fireapproved.com/diagrams/det-014-roof-to-wall-dormer-cheek.svg" alt="An orientation view and enlarged conceptual section show a dormer cheek as one roof-to-wall line with three separate jobs: roof assembly, exterior wall covering to the roof, and flashing at the debris-collection joint." />

Canonical URL: https://fireapproved.com/diagrams/det-014/