Home / Guides / How to read a record / How to read a state page
How to read a state page
A state landing is one page for what we can cite in that state. It is not a parcel map, and the coverage chip is not a permit. Live means a sourced statewide construction picture is on the page. Coming-soon means adopted-but-not-effective. None means no statewide WUI construction book is sourced. Not yet reviewed asserts nothing. Plants can be complete in every state while construction is still a gap.
You are on Places looking at Nevada, Utah, or a state with only plant counts, and asking whether “none” means you can skip the eave. It does not. Open the landing. Read the construction sentence. Then ask the building official which adopted code binds the lot.
Why it matters
A missing statewide book is not a missing fire. Embers still land. Locals still adopt overlays. Insurers still read checklists. Reading the coverage label as a lot determination is the mix-up this page exists to stop.
How it works
Each state landing joins four distinct layers: the sourced construction record, documented application scopes and unresolved predicates, requirements published in the cited instrument, and plant evidence. Product and plant URLs stay national. The state page assembles and links those layers without pretending that publication, adoption, and parcel application are the same fact.
Construction status is coverage-honest:
| Label | What it asserts | What it does not assert | Opened example |
|---|---|---|---|
| Live | A sourced statewide construction picture is on the landing | That this site read your parcel, or that every city uses that book unmodified | Colorado’s 2025 CWRC. 101.1 is still adopted by a named jurisdiction. See Colorado CWRC adoption. |
| Coming-soon | The statewide book is written and not yet in force, or the current edition is not the future edition | That you should spec the future book today | Utah 15A-2-103: 2006 Utah WUI Code for local adoption now; 2024 IWUIC effective 1 January 2027. See Utah WUI code status. |
| None | No statewide WUI construction book is sourced | That no local ordinance, overlay, or insurer checklist exists | Nevada deletes statewide IWUIC Chapter 5 while Clark County has a local 2024 book. Wyoming’s state list omits IWUIC while Jackson and unincorporated Teton County have separate local 2024 applications. |
| Not yet reviewed | Nothing. We have not opened a statewide construction document | That the state has no rules | The construction section is empty on purpose. Plant counts can still be in the thousands. |
A local place under a none or coming-soon state can still have a sourced local record. That record is typed—code adoption, local code, code administration, fire access, inspection, or fire service—so a source about access is not presented as an adopted construction code. Eagle, Idaho is an overlay inside a none state. See when the overlay map decides the eave.
Wyoming is the same data shape with a different legal record. The statewide
code list does not include IWUIC, so the state landing says none. Jackson’s
corporate-boundary adoption and Teton County’s unincorporated-land adoption
remain live local applications underneath it. The state label and the local
records answer different questions.
Florida prevents another reading error. Its Building Code is statewide, and
its Fire Prevention Code is a separate NFPA-based book, but the statutory
model-code list used to update the Building Code does not include IWUIC. A
none WUI label does not mean “no building code”; it means the sourced
statewide construction layer does not contain a WUI book.
Texas makes the local-adoption boundary concrete. Section 214.212 supplies a
municipal IRC path, not a statewide IWUIC book. Austin’s mapped 2024 WUIC is a
separate local application with its own proximity, project, boundary, and date
checks. A Texas none label and an Austin local code can both be accurate.
ZIP resolution is a reversible location lens. It supplies a postal match and can surface a sourced place, but it is not a legal-boundary lookup. Construction becomes documented only through an application record; hazard-map, project-type, effective-date, boundary, and official-confirmation predicates remain visible instead of being silently treated as satisfied.
The paths
- Open
/places/. Sourced statuses are listed with live / coming-soon / none. The rest say not yet reviewed. - Open the state landing. Read the construction sentence and any official map tool. The map tool is not a parcel read.
- Open local places if the landing names them. A county book can be stricter than a none state.
- Ask the building official which ordinance is adopted. Spec that book.
- Harden anyway if no WUI construction book applies. IBHS is a designation, not adopted code.
What people mix up
- Reading “none” as “no wildfire rules.”
- Specifying Utah 2024 IWUIC in 2026 because the future edition is already written.
- Treating a live Colorado landing as a lot class.
- Treating plant completeness as a construction book.
- Treating not-yet-reviewed as a finding.
- Importing Oregon R327 or California CWUIC onto a none-state drawing.
How to check
- Open Places. Note the status word next to the name.
- Open the landing. If the construction sentence names a statute, open that statute.
- If locals are listed, open the local landing before you spec “the state book.”
- Confirm with the building official. This site does not read your parcel.
Limits
This page explains the coverage labels. It does not stamp a permit. It does not classify a lot. It does not fill a not-yet-reviewed state with guessed IWUIC. Utah 15A-2-103, NAC 477.283, and the 2025 CWRC are the opened examples; other states follow the same honesty rule when their documents are opened.
Related records
- Places
- Utah WUI code status
- Nevada WUI code status
- Colorado CWRC adoption
- How WUI is mapped
- Methodology
Questions
Does “none” mean my state has no wildfire rules?
No. None means this site has not sourced a statewide WUI construction book. Locals may still have adopted IWUIC. Nevada’s State Fire Marshal deletes IWUIC Chapter 5 statewide; Clark County still has a 2024 book. Confirm with the building official.
Does “coming-soon” mean I can spec the new book today?
No. Coming-soon is adopted-but-not-effective. Utah’s 15A-2-103 currently offers the 2006 Utah Wildland Urban Interface Code for local adoption. The 2024 IWUIC is effective 1 January 2027. Spec the current local ordinance.
Does “live” mean this site read my parcel?
No. Live means a sourced statewide construction picture is on the state landing. Colorado’s 2025 CWRC is that kind of book, and it still has to be adopted by a named jurisdiction. This site does not classify a lot.
Does “not yet reviewed” mean there is no code?
No. It asserts nothing. Plant evidence can still be complete. The construction section fills in when a public document is opened. A missing section is never a claim that no rules exist.
Why does a state page list thousands of plants if the code box is empty?
The landing spans three branches. Plants are cited records for what grows there. Construction status is a separate sourced sentence. Completeness in one branch does not fill a gap in the other.
Why does Wyoming say “none” while Jackson and Teton County have local pages?
Because the label describes the statewide construction picture. Wyoming's current incorporated-code list does not name IWUIC. Jackson and unincorporated Teton County separately adopted 2024 IWUIC for their own scopes. A local application can exist beneath a state with no sourced statewide WUI construction book.
Why does Florida say “none” when it has a statewide building code?
Because `none` is specific to a statewide WUI construction book, not to all construction regulation. Florida's Building Code is statewide, but F.S. 553.73's update list does not name IWUIC. The Florida Fire Prevention Code is a separate NFPA path.
Why does Texas say “none” while Austin has a WUI code and map?
Because the state label and local application answer different questions. Texas Local Government Code 214.212 supplies a municipal IRC path, not a statewide IWUIC book. Austin separately adopted a 2024 WUIC for projects that meet its local map, proximity, scope, and date predicates.
Sources
- Utah Code 15A-2-103 Specific editions adopted
- Nev. Admin. Code § 477.283 Changes to codes adopted by reference
- 2025 Colorado Wildfire Resiliency Code
- Clark County Ordinance 5320 Wildland-Urban Interface Code
- Wyoming Council on Fire Prevention Chapter 1 General Provisions
- Florida Statutes 553.73 Florida Building Code
- Texas Local Government Code 214.212 International Residential Code