{"id":"cwuic-2025-sfm-12-7a-3-horizontal-underside","license":"CC-BY-4.0","data":{"title":"2025 California WUI Code SFM 12-7A-3 horizontal-underside path","shortName":"California SFM 12-7A-3 underside","summary":"The 2025 California Wildland-Urban Interface Code includes SFM Standard 12-7A-3 performance paths for boxed-in eave soffits and the undersides of floor projections.","framing":"A matching test protocol is product evidence only for the exact application in its listing. Eave versus projection geometry, complete assembly, installation, current listing status, local amendments, and approval remain checks.","kind":"code","instrumentId":"cwuic-2025","jurisdiction":"California mapped fire hazard areas","placeIds":["us-ca"],"appliesToCategories":["eaves"],"quotedText":"meets the performance criteria in accordance with the test procedures set forth in SFM Standard 12-7A-3","source":{"title":"2025 California Wildland-Urban Interface Code construction notes, Sections 504.3 and 504.7.1","url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/truckeeca-meet-b4e3431e34524152945f1977841011c4/ITEM-Attachment-001-59998400eff64dacbed9b4337d86e20a.pdf","publisher":"Town of Truckee public record","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"},"constraints":[{"attribute":"testStandard","op":"eq","value":"sfm-12-7a-3"}],"relatedStandards":["cwuic","sfm-12-7a-3"],"author":"grayson-graham","reviewStatus":"draft","lastVerified":"2026-08-27T00:00:00.000Z"},"applications":[{"id":"cwuic-2025-california","title":"California 2025 CWUIC mapped-area application","instrumentId":"cwuic-2025","placeId":"us-ca","status":"active","geographicScope":"mapped-area","scopeSummary":"California applies 2025 CWUIC Chapter 5 to new buildings in mapped State Responsibility Area fire-hazard zones and in locally designated High and Very High zones; the official map, permit facts, any local amendment, and the enforcing agency still govern a project.","effectiveOn":"2026-01-01T00:00:00.000Z","requirementIds":["cwuic-2025-class-a-roof-test-path","cwuic-2025-exterior-glazing-tempered","cwuic-2025-nfpa-252-exterior-door","cwuic-2025-noncombustible-enclosed-open-eave","cwuic-2025-noncombustible-exterior-wall","cwuic-2025-roof-profile-closures","cwuic-2025-roof-valley-flashing","cwuic-2025-sfm-12-7a-1-exterior-door","cwuic-2025-sfm-12-7a-1-exterior-wall","cwuic-2025-sfm-12-7a-3-horizontal-underside","cwuic-2025-astm-e2886-vent","cwuic-2025-one-hour-exterior-wall"],"requirementCoverage":"partial","requirementCoverageSummary":"These 12 rows normalize exact Chapter 5 product semantics that the current catalog can prove. They are not full Chapter 5 normalization; gutters, underfloor enclosure, deck assemblies, accessory structures, alternative glazing and door paths, installation, and local amendments remain outside this cross-section.","requirementScopes":[{"requirementId":"cwuic-2025-class-a-roof-test-path","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This tested roof-assembly path applies only after the official map, permit facts, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.2"]},{"requirementId":"cwuic-2025-exterior-glazing-tempered","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This tempered multilayered-glazing path applies only after the official map, permit facts, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.8"]},{"requirementId":"cwuic-2025-nfpa-252-exterior-door","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This NFPA 252 exterior-door path applies only after the official map, permit facts, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.9"]},{"requirementId":"cwuic-2025-noncombustible-enclosed-open-eave","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This noncombustible eave path applies only after the official map, permit facts, exact eave condition, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.3","504.3.1"]},{"requirementId":"cwuic-2025-noncombustible-exterior-wall","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This noncombustible wall path applies only after the official map, permit facts, assembly extent, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.5","504.5.2"]},{"requirementId":"cwuic-2025-roof-profile-closures","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This roof-profile closure applies only after the official map, permit facts, roof profile and deck, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.2.1.1","504.2.1.2"]},{"requirementId":"cwuic-2025-roof-valley-flashing","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This roof-valley metal path applies only after the official map, permit facts, full underlayment detail, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.2.2"]},{"requirementId":"cwuic-2025-sfm-12-7a-1-exterior-door","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This SFM 12-7A-1 exterior-door surface path applies only after the official map, permit facts, exact listed model and installation, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.9"]},{"requirementId":"cwuic-2025-sfm-12-7a-1-exterior-wall","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This SFM 12-7A-1 exterior-wall assembly path applies only after the official map, permit facts, exact listed assembly and installation, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.5"]},{"requirementId":"cwuic-2025-sfm-12-7a-3-horizontal-underside","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This SFM 12-7A-3 underside path applies only after the official map, permit facts, exact eave or projection condition and listed installation, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.3","504.7","504.7.1"]},{"requirementId":"cwuic-2025-astm-e2886-vent","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This ASTM E2886 vent path applies only after the official map, permit facts, exact vent location and listed installation, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.10","504.10.1"]},{"requirementId":"cwuic-2025-one-hour-exterior-wall","scopeKeys":["applicable-new-building-in-mapped-area"],"scopeSummary":"This one-hour exterior-side wall path applies only after the official map, permit facts, full listed assembly, local amendments, and enforcing agency place the new building within Chapter 5.","sourceSections":["504.5"]}],"map":{"status":"linked-official-tool","summary":"CAL FIRE's official statewide viewer accepts an address and displays State and Local Responsibility Area fire-hazard zones; the local jurisdiction remains the source for an adopted Local Responsibility Area designation and project decision.","url":"https://experience.arcgis.com/experience/5065c998b4b0462f9ec3c6c226c610a9","source":{"title":"Fire Hazard Severity Zones","url":"https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/fire-hazard-severity-zones","publisher":"CAL FIRE Office of the State Fire Marshal","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"}},"projectTriggers":[{"summary":"OSFM describes the construction requirements as applying to new buildings with a building-permit application in the named State and Local Responsibility Area fire-hazard zones; repair, replacement, alteration, and local-amendment questions still require the enforcing agency.","sourceSections":["Application Date and Where Required","Ignition Resistant Wildland-Urban-Interface Standards"],"source":{"title":"Building in the Wildland","url":"https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/building-in-the-wildland","publisher":"CAL FIRE Office of the State Fire Marshal","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"}}],"supportingSources":[{"title":"2025 California Building Standards Code publication and effective date","url":"https://www.dgs.ca.gov/bsc/codes","publisher":"California Building Standards Commission","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z","documentDate":"2025-07-01T00:00:00.000Z"},{"title":"Fire Hazard Severity Zones","url":"https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/fire-hazard-severity-zones","publisher":"CAL FIRE Office of the State Fire Marshal","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"},{"title":"2025 California Wildland-Urban Interface Code construction notes","url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/truckeeca-meet-b4e3431e34524152945f1977841011c4/ITEM-Attachment-001-59998400eff64dacbed9b4337d86e20a.pdf","publisher":"Town of Truckee public record","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"}],"unresolvedPredicates":["official-hazard-map","project-type","official-confirmation"],"source":{"title":"Building in the Wildland","url":"https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/building-in-the-wildland","publisher":"CAL FIRE Office of the State Fire Marshal","sourceType":"official","accessedOn":"2026-08-27T00:00:00.000Z"},"author":"grayson-graham","reviewStatus":"draft","lastVerified":"2026-08-27T00:00:00.000Z"}],"products":[{"id":"blocks-and-cutstock-s-a-advantage-plus-treated-radiata-pine-in-1-x-6-v","name":"Advantage Plus treated Radiata pine in 1\" x 6\" V-Rustic Shiplap (Pattern 793)","url":"/materials/blocks-and-cutstock-s-a-advantage-plus-treated-radiata-pine-in-1-x-6-v/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2126:0101","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2126:0101, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"boral-composites-inc-boral-truexterior-trim-5-8-to-1-1-2-thick-and","name":"Boral TruExterior® Trim 5/8\" to 1-1/2 \" thick and widths ranging from 1-1/2\" to *15 1/2\" a","url":"/materials/boral-composites-inc-boral-truexterior-trim-5-8-to-1-1-2-thick-and/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2134:0101","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2134:0101, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"canyon-lumber-company-8160-2380-0002","name":"Canyon Lumber Company (8160-2380:0002)","url":"/materials/canyon-lumber-company-8160-2380-0002/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2380:0002","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2380:0002, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"canyon-lumber-company-8160-2380-0003","name":"Canyon Lumber Company (8160-2380:0003)","url":"/materials/canyon-lumber-company-8160-2380-0003/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2380:0003","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2380:0003, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"iti-chile-8160-2234-0500","name":"ITI Chile (8160-2234:0500)","url":"/materials/iti-chile-8160-2234-0500/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2234:0500","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2234:0500, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"nusku-partners-llc-8160-2064-0026","name":"Nusku Partners LLC (8160-2064:0026)","url":"/materials/nusku-partners-llc-8160-2064-0026/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2064:0026","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2064:0026, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"nusku-partners-llc-8160-2064-0502","name":"Nusku Partners LLC (8160-2064:0502)","url":"/materials/nusku-partners-llc-8160-2064-0502/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2064:0502","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2064:0502, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"nusku-partners-llc-8160-2064-0504","name":"Nusku Partners LLC (8160-2064:0504)","url":"/materials/nusku-partners-llc-8160-2064-0504/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2064:0504","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2064:0504, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"paneltek-products-ltd-paneltek-engineered-cedar-external-soffit-for","name":"Paneltek Engineered Cedar external soffit for external use in Wildland-Urban Interface Are","url":"/materials/paneltek-products-ltd-paneltek-engineered-cedar-external-soffit-for/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2246:0500","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2246:0500, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"boral-composites-inc-boral-truexterior-beadboard-0-625-actual-thickness","name":"TruExterior® Beadboard soffit and porch-ceiling panels","url":"/materials/boral-composites-inc-boral-truexterior-beadboard-0-625-actual-thickness/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2134:0106","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2134:0106, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]},{"id":"defiance-forest-products-tt-205-t-g-cedar-siding-nominal-1x6-and-wider-tt-205","name":"TT-205 T&G Cedar Siding - Nominal 1x6 and wider over 1/2 gypsum board","url":"/materials/defiance-forest-products-tt-205-t-g-cedar-siding-nominal-1x6-and-wider-tt-205/","categories":["eaves"],"complianceStatus":"listed","documentedAttributes":[{"attribute":"testStandard","value":"sfm-12-7a-3","source":{"title":"OSFM Building Materials Listing — 8160-2294:0501","url":"https://calfire.govmotus.org/BMLSearch/Index","publisher":"CAL FIRE OSFM","accessedOn":"2026-08-25T00:00:00.000Z","sourceType":"official-listing"},"documentLocation":"Listing 8160-2294:0501, TEST PROTOCOL","excerpt":"TEST PROTOCOL: SFM 12-7A-3"}]}],"matchContract":"Products appear only when their cited fields satisfy this requirement's normalized constraints. Application scope and unresolved predicates remain separate; an attribute match is not a permit decision."}